-A +A

This is a border Tunnel to spain (high Aragon).

The works started in autumn 1967 and ended in 1976. The opening date to traffic was the 12th October of the same year. Free payed, the tunnel is forbidden to all vehicle above 4.3 metres high and transporting dangerous goods.

Click here for opening tunnel conditions